Skip to content
ALDOT News Hub
Resurfacing of SR-133/Cox Creek Parkway will begin Sunday night. The project includes resurfacing through multiple intersections, including the intersection with Darby Drive.

Resurfacing of SR-133/Cox Creek Parkway in Florence will begin the evening of Sunday, July 27, weather permitting.

In the $1.4 million project, contractor Rogers Group will mill and resurface more than two miles of the corridor from US-72/Florence Boulevard to SR-17/Helton Drive.

Initial work will include milling at intersections, installing signal detection loops, and patching.

Read More “Resurfacing of SR-133/Cox Creek Parkway in Florence to start Sunday night”

ALDOT workers repair a damaged rail on the flyover bridge at I-65 and I-565.

ALDOT is making final repairs to the damaged flyover bridge at the I-65 and I-565 interchange today.

A steel coil fell from a truck Tuesday and damaged the bridge and ramp from I-565 westbound to I-65 southbound.

Yesterday, ALDOT crews milled and paved to repair the asphalt roadway of the ramp, then began preparations…

Read More “ALDOT making final repairs to damaged I-65 ramp bridge today”

Contractors raised the Upper River Road bridge over I-65 by jacking it and inserting metal shims, which will be encased in concrete.

The Parker Road bridge over I-65 near Hartselle is scheduled to close Thursday, July 24, at noon as part of a project to raise the bridge structure.

Crews will elevate the bridge 13 inches to achieve a 17-foot clearance over I-65. The closure is expected to last about six weeks, and motorists should use alternate…

Read More “Parker Road bridge over I-65 to close Thursday at noon”

Steel coil that fell from a truck this afternoon at the I-65 and I-565 interchange.

ALDOT crews are making safe a bridge and exit ramp damaged by a steel coil that fell from a truck this afternoon at the I-65 and I-565 interchange.

The approach, deck and rail of the flyover bridge from I-565 westbound to I-65 southbound were damaged in several places.

ALDOT crews patched lightly-damaged areas but will…

Read More “ALDOT making safe a bridge and ramp damaged by steel coil”

Enterprise Municipal Airport terminal.

As part of its commitment to aviation safety across the state, the Alabama Department of Transportation’s (ALDOT) Aeronautics Bureau conducted inspections this past week. The team visited Enterprise Municipal Airport and the Flowers Hospital helipad in Dothan.

Routine inspections keep Alabama’s aviation network safe, reliable, and prepared for daily and emergency use.

Airport inspection

“Enterprise…

Read More “ALDOT’s role in airport inspections”

Demolition of the bridge on SR-243 at Cedar Creek in Franklin County

Demolition of the bridge on SR-243 at Cedar Creek in Franklin County began today.

Removal of the 60-year-old bridge southeast of Russellville will make way for a replacement to be constructed by contractor Miller and Miller.

ALDOT estimates the $2.8 million project will take about a year.

Excavator demolishing the existing bridge on SR-243 in…Read More “Bridge demolition on SR-243 at Cedar Creek begins”

Geotechnical work began today on US-98 at Fly Creek

Starting today, July 21, the Alabama Department of Transportation (ALDOT) is starting a short-term geotechnical investigation along US-98 at Fly Creek in Fairhope. This work is an important step in the engineering planning and design of new bridges that will replace the current culvert structure.

Drill crew drilling on US-98 Drill crew drilling on US-98…Read More “Geotechnical work started today on US-98”